ASQ

Exclusive Content & Downloads from ASQ

A Note on Unrestricted AOQLs

Summary: In the past there have been a number of papers in which it has been shown that the AOQL of any Dodge type plan depends heavily on whether or not the assumption of statistical control is imposed on the production process. Through consideration of the continuous sampling plan CSP-1 it will be shown (by comparison with known results) that these AOQLs also depend on the type of sampling done while on partial inspection and on the interaction of the production process with the inspection procedure.

Anyone with a subscription, including Site and Enterprise members, can access this article.


Other Ways to Access content:

Join ASQ

Join ASQ as a Full member. Enjoy all the ASQ member benefits including access to many online articles.

Subscribe to Journal of Quality Technology

Access this and ALL OTHER Journal of Quality Technology online articles. You'll also receive the print version by mail.

  • Topics: Sampling
  • Keywords: Sampling plans,Average outgoing quality levels (AOQL) plans
  • Author: Sackrowitz, Harold
  • Journal: Journal of Quality Technology