ASQ

Exclusive Content & Downloads from ASQ

Economic Design of CSP-1 Plan Under the Dependent Production Process and Linear Inspection Cost

Summary: [This abstract is based on the authors' abstract.]It has been argued that in the economic design previously presented of a type 1 continuous sampling (CSP-1) plan under the linear inspection cost, the production process is seldom independent. The problem is addressed with the economic design of a CSP-1 plan under the dependent production process and linear inspection cost. A solution is developed to identify the unique combination that will meet the average outgoing quality limit requirement while minimizing the total expected cost per unit produced during one inspection cycle.

Anyone with a subscription, including Site and Enterprise members, can access this article.


Other Ways to Access content:

Join ASQ

Join ASQ as a Full member. Enjoy all the ASQ member benefits including access to many online articles.

  • Topics: Sampling, Inspection
  • Keywords: Average Outgoing Quality (AOQ),Average fraction inspected (AFI),Average outgoing quality limit (AOQL),Sampling plans,Inspection sampling,Markov chains,Continuous sampling plan
  • Author: Chen, Chung-Ho; Chou, Chao-Yu
  • Journal: Quality Engineering