ASQ

Exclusive Content & Downloads from ASQ

Graded Approach to Application of Quality Assurance Controls at the Waste Isolation Pilot Plant

Summary: [This abstract is based on the authors' abstract.]The Washington TRU Solutions LLC (WTS) reengineering initiative for the application of graded approach at the DOE Waste Isolation Pilot Plant (WIPP) is described. WIPP is non-reactor nuclear storage facility used for permanent disposal of transuranic (TRU) waste. New DOE guidance advocates the graded-approach concept to the application of quality assurance controls to the design and construction of systems, structures and components (SSCs) based on their importance to nuclear safety. A methodology adopted to assure safety in accordance with the guidelines expands the application of graded approach beyond SSCs to include activities such as procurement and procedures. The integration of the reengineered graded approach process with other site management systems forms the basis for WIPP Integrated Safety Management Systems.

Anyone with a subscription, including Site and Enterprise members, can access this article.


Other Ways to Access content:

Join ASQ

Join ASQ as a Full member. Enjoy all the ASQ member benefits including access to many online articles.

  • Topics: Environmental Management Systems, Quality Assurance, Quality Control, Safety
  • Keywords: Department of Energy (DOE),Environmental management,Nuclear,Quality assurance (QA),Quality control methodology,Safety,Waste disposal
  • Author: Ater, E.L.; Strait, A.E.
  • Journal: Quality Engineering