ASQ

Exclusive Content & Downloads from ASQ

Thinking Lean: Waste Not, Want Not

Summary: Based on the Toyota Production System (TPS) and used in hundreds of thousands of organizations across the world during the last 30 years, lean is a set of management practices to improve efficiency and effectiveness by eliminating waste. The seven wastes (or muda) of lean manufacturing originally identified in the TPS are: waiting, inventory, motion, transportation, defects, overprocessing and overproduction. The eighth waste of lean is unique from the original seven in that its elimination can directly benefit the employees, as well as the employer. The eighth waste is considered to be the under-utilization or sub-optimization of resources (personnel). An underutilized employee is not challenged by his or her duties and, hence, not working to his or her full potential.

Anyone with a subscription, including Site and Enterprise members, can access this article.


Other Ways to Access content:

Join ASQ

Join ASQ as a Full member. Enjoy all the ASQ member benefits including access to many online articles.

Subscribe to Six Sigma Forum Magazine

Access this and ALL OTHER Six Sigma Forum Magazine online articles. You'll also receive the print version by mail.

  • Topics: Lean
  • Keywords: Lean, Six Sigma, Personnel, Muda, Quality function deployment, Employee, Employee engagement,
  • Author: Coleman, Lance B.
  • Journal: Six Sigma Forum Magazine